EPA/CARB Compliant Low Permeation Fuel Line
Product: | EPA/CARB Compliant Low Permeation Fuel Line |
Item No.: | JBD-A003 |
Size & Shape: | ID≥Φ2.5 mm; Customized as Required. |
Material: | FKM; FKM/ECO; FKM/ECO/AR/ECO |
Structure: | 1 to 4-layers |
Color: | Black |
Application | Use for All-Terrain Vehicle ( ATV), Motorcycle, Snowmobiles,Automobiles, Engines, Outdoor Power Equipments, Garden Machinery, Lawn Mower, Chainsaw, Trimmer, Off-Road Engines, Marine Engines, Small Engines and Generators. |
EPA & CARB CERTIFICATE | YES. |
Standard | SAE, YDK,HES, EX-S,ASTM and so on |
Shipping Port | Xiamen |
OEM/ODM | Accepted |
Package | PE bag+Carton+Pallet |
Payment Terms | T/T, L/C,Western Union |
Factory | ISO/IATF16949 registered |
Technical Teams | 30+ Years experience |
Sample Leadtime | 7-15 days |
Production Leadtime | 20-30 days |
OEM & ODM
The EPA & CARB Compliant Fuel Line can be acceptable OEM & OEM as per client's drawings ,samples and other requirements, meeting the requirement according to the Standard of SAE, YDK,HES, EX-S,ASTM.
EPA & CARB CERTIFICATE
The EPA/CARB Compliant Fuel Line is achieved the EPA & CARB Certificate authorized by
PERMEATION | ASTM FULE C, METHODS CONFORM TO 9.1~9.2 |
g/m2/24H | 15g MAX |
according to the requirement in North American markets under meeting the Low Permeation at less than 15 g/m2/day requirement.
Application
The EPA/CARB Compliant Fuel Line is widely use for All-Terrain Vehicle ( ATV), Motorcycle, Snowmobiles,Automobiles, Engines, Outdoor Power Equipments, Garden Machinery, Lawn Mower, Chainsaw, Trimmer, Off-Road Engines, Marine Engines (Inboard & Outboard Marine Engines ), Small Engines and Generators.
Our Uniquie Advantages:
A: 30+ Years Experienced Professional Technical Teams with strong R&D Center.
B: Powerful Capacity with 4 Factories Production Base.
C: Stable Quality and Competitive Price----We are an integrated company combining Rubber Raw Materials Refining & Mixer Process and manufacturing Rubber products with professional Technics, as well as Rubber Raw Materials Wholesales.
D: Delivery time----20-30 days for mass production.
Structure of Hose
Process Of Quality Control
Process of Product Development
Products Collect
Packaging & Shipping